Final Project Summary

Restoration Guidelines

A full project summary will be drafted upon completion of all mechanized maintenance work, and at least six (6) months of post monitoring. The project summary will include all pertinent information on the completed project including reasons for maintenance, the specifications of the completed work, and any other special conditions that may have been incorporated as part of the project.

In addition to the project summary, attachments will include:

  • DEP and Conservation Commission Notification Letters.
  • Project Site Plan and Topographic Maps.
  • Project Master and Permission Slips from Property Owners.
  • Assessor’s Map of Project.
  • Before and After Photographs of Project.
  • Dig Safe Ticket.
  • Any Correspondence Related to the Project.
  • Survey Information (including stream profiles, soil and water analysis, site history, breeding history, etc.).
  • Back-up Materials.

All jobs completed after January 1, 2005 will have a project completion form that will outline technical field staff who worked on the project, total footages of work completed, and a brief explanation of the project.

Information on each project completed by CMMCP can be found in the Water Management central file, located at the main office at 111 Otis St., Northborough, MA 01532. It may be possible to obtain a full report on a project if the request is approved by the Executive Director and submitted in writing.